I’m having trouble getting a bond, what should I check?
You should troubleshoot your application in this order: 1) Is the adhesive right for BOTH materials? (Most failures are due to using the wrong adhesive for the material. For example, HH-66 does not bond polyethylene or polypropylene.) 2) Are the surfaces clean, dry, and oil-free? (Lightly sand glossy surfaces and clean off the dust.)
Are your products water-based?
No, all current RH Adhesives products are solvent-based.
How do I apply your adhesives? (basic steps)
Clean surfaces with alcohol or compatible solvent. Sand any glossy surfaces lightly. Apply an even coat to BOTH surfaces to be joined. Allow cement to set until tacky, typically around two minutes. Cement will remain tacky for just a few minutes (slightly longer tack time for our neoprene adhesives). Press together while tacky and allow to bond for at least an hour before use. Strongest hold achieved after one day.
How do I know which adhesive will work on my material?
Use our compatibility guide at rhadhesives.com/products, searchable by material.
What’s the difference between tack time, work time (open time), and cure time?
Tack time, work/open time, and cure time are three different events, not one clock. TACK TIME: After you apply the cement, the tack time is the short wait (generally ~2 min) until it turns tacky. WORK/OPEN TIME: After the cement reaches its tacky state, work/open time is the few-minute window while the adhesive remains tacky. You must press the parts together during this window. CURE TIME: What happens after bonding is the cure time, while the joint keeps strengthening for ~24 hours until full strength. A key point is that you bond during the tack window, then let it cure.